Delivering Recall’s High Tech Document Storage Facility

Recall Office and Warehouse Development

Delivering Recall's High Tech Document Storage Facility

Client

CIAL

Location

Christchurch

Completion

2011

Category
Industrial
About This Project

Construction of a purpose built high security document storage facility to meet international standards.
The facilities included a 4,100m2 warehouse, a smaller 810m2 warehouse, 930m2 3-hour fire rated warehouse, 300m2 enclosed loading dock, 350m2 office area and a 500,000 litre fire sprinkler reservoir and sprinkler valve house. Arrow also managed the design and construction of the tenant fitout works directly with Recall.

 

Unique Aspects

The project was completed over 30% under budget and 4 months ahead of programme. Arrow managed the building design phase so that the building could be erected in a fast track manner. Extensive Fire Protection systems were incorporated into the building. The storage facilities were designed for future expansion without major disruption to the operation of the facility.